How Long Does A Bathroom Remodel Take?
Have you been wondering how long a bathroom remodel takes? Are you planning to upgrade your bathroom, and you need to know the expected timeline? The majority of homeowners need their bathroom renovation project completed as soon as possible and anticipate finishing it within a week or two. This is possible with minor changes, but a complete bath renovation takes six to twelve weeks or more. Every process, like tearing it out, plumbing, electrical, tiling, and finishing, takes time and patience. Hurrying will result in cost-prohibitive errors and poor quality.
To have a realistic expectation, it is important to learn the various steps in a bathroom renovation. In this article, we shall discuss all the steps involved in a bathroom renovation.
Related Articles
What Is The 30% Rule For Renovations?
Bathroom Decoration: Practical Advice on Choosing Wall Materials
Top Apartment Furnish Distributors
Overall Duration Of A Bathroom Renovation
The timeline for a bathroom remodel varies depending on the type of remodel. Small updates, such as repainting walls and replacing fixtures, may take only one to two weeks. Partial remodels involving new wall panels, replacing vanities, and plumbing adjustments may stretch to three to six weeks. However, a full bathroom remodel, which involves demolishing the entire space, re-plumbing, installing new fixtures, and making structural changes, may also require replacing decoration lines and timber tubes in bathrooms with solid wood wall panels, and may take six to twelve weeks or even longer. Another major factor that affects the timeline is whether you are doing the remodel yourself or hiring a professional. DIY renovations usually take longer due to a lack of experience and limited time to work.
Understanding The Bathroom Remodel Timeline
A bathroom remodel doesn’t happen in one step. It involves multiple phases, from planning and demolition to plumbing, electrical work, tiling, and final installations. Understanding each phase will give you a clear picture of what to expect and why each stage takes time.
The entire process can be divided into three major stages: Pre-Construction, Construction, and Post-Construction. Each phase has specific tasks that must be completed before moving on to the next. If one phase is delayed, it affects the entire timeline. This is why proper planning and hiring skilled professionals are essential for keeping the project on track.
1. Pre-Construction Phase: The planning phase (1 – 4 weeks)
The first step in this phase is planning and design, which typically takes one to two weeks. This is where you decide on the layout, colour scheme, fixtures, and materials for your new bathroom. Some homeowners work with an interior designer, while others rely on contractors for design input. If you’re doing this yourself, expect to spend extra time researching and making decisions.
You also have to prepare a budget and a plan to hire a professional, which will take one to two weeks. You need to hire the right person since skilled people tend to have occupied schedules for months. If you delay hiring someone, your project will have to wait before it even gets underway. You need to gather numerous quotes and testimonials to ensure that you hire someone reliable.
It is also in this phase that you decide if your project will need a permit or not. If your project involves a lot of plumbing or electrical, you will probably require a permit which will actually take two to six weeks depending on your area and local regulations. It is always advised to call your local building department in advance to avoid delay
2. Construction Phase (2 – 5 weeks)
You have carried out all the necessary steps needed to renew your bathroom. Here is where the real work begins
- Demolition and Site Preparation (1 -2 weeks)
This is done immediately after the planning phase. It involves tearing down the old bathroom and preparing the site for renovation which typically takes about one to two weeks depending on the size of your bathroom and the extent of demolition.
The first step is removing old plumbing, floors, and tiles. Depending on the size of the area, it could take one to three days. Workers remove sinks, toilets, bathtubs, and cabinets but leave the plumbing and electrical systems intact. If you intend to reuse the fixtures, they must be carefully taken out to avoid damage.
Once the structures are removed, the next process is the discovery of concealed issues in the building, which may last up to one week. The majority of homeowners are not aware of the hidden issues in their bathroom until the demolition begins. Some issues are mould, water damage, rotting floorboards, and outdated plumbing or wiring. If these issues are discovered, additional repairs are required before proceeding. Repairing structural issues could take longer and cost more, but it is better to do it now rather than having to create issues later on.
- Plumbing, Electrical, And Structural Work (2 – 4 weeks)
One of the most important phase of a bathroom renovation is replacing the plumbing, installing new electrical wires, and making structural modifications. If the toilet, the sink, or shower must be relocated, the pipes and drain have to be moved by the plumbers. The process takes one to two weeks to complete. The task needs to be done effectively to avoid leakage or drain issues in the future.
At the same time, electricians will install new wiring, lighting fixtures, and outlets. Electrical work is often inspected by local authorities to ensure it meets safety standards. If inspections are required, they can add a few extra days to the timeline.
- Tiling, Flooring, And Painting (2 – 3 weeks)
Tiling is time-consuming if you’re renovating a bathroom. Regardless of whether you’re using ceramic, porcelain, or stone, you have to cut, lay, and fill the spaces between the tiles with great care. If you choose a basic design, it could take five to seven days to complete. If your design is complicated with difficult patterns, mosaic pieces, or custom designs, it could take as much as two weeks.
It takes roughly the same number of days to install as the material of the flooring. Then the walls and ceiling have to be painted. Two to three days is the length of time it takes to paint, depending on the number of coats of paint. Some individuals use mildew-resistant paint to prevent mould and mildew, but this takes longer to dry.
- Fixtures Installation and Final Touches (1 – 2 weeks)
Your bathroom is starting to take shape at this point, but some key elements, like sinks, toilets, bathtubs, mirrors, and cabinets, are yet to be installed. The installation of these fixtures typically takes one to two weeks, depending on the complexity of the design. All of these fixtures must fit together to function correctly and appear attractive.
When you are done with your installation, give it some final touches, which include sealing grout lines, applying caulking around sinks and tubs, and testing water flow. Contractors will also check for leaks, ensure proper drainage, and inspect ventilation to prevent future moisture issues.
3. Post-Construction Phase (1 week)
Although often overlooked, it’s also an essential part of the renovation process. It takes a week and consists of verifying the work, making final changes, and cleaning the area. The bathroom will need to be checked to verify that it is done the right way. In some areas, a final inspection by a local building authority may be required, especially if major plumbing or electrical changes were made. If the construction aligns with the building code, the contractor will be allowed to wash the bathroom properly.
Conclusion
A bathroom renovation is a challenging but enjoyable project. The length of time depends on how much you do, the quality of the items that you select, and what issues you run into. A minor update takes two to four weeks to complete, but a complete renovation takes six to twelve weeks or longer.
To have your project finished on time, prepare in advance, decide on the material in advance, and hire quality workers. Preparing ahead of a delay, such as permit approvals, structural issues, or material shortages, will prepare you and spare you the disappointment.
Although it takes a long time to do it, the end result is always a nice and functional new bathroom and it is worth it. With proper planning and a good team, your dream bathroom will soon be complete.